In 2011 “Watzenrode” has performed trans-shipment station design and construction for PJSC “Mirgorod Mineral Water Plant”.
About
Project description
Design
Concrete and reinforced concrete works
Steel frame installation
Finishing works
In 2011 “Watzenrode” has performed trans-shipment station design and construction for PJSC “Mirgorod Mineral Water Plant”.
Design
Concrete and reinforced concrete works
Steel frame installation
Finishing works
All rights reserved
Watzenrode 2013-2022